Project DescriptionsForest Grove PromenadeClient: Sterling Development
3352 Holiday Court, Suite 224 La Jolla, CA 92037-1808 Summary: Integral part of design team providing Construction Management/GC services overseeing development and construction of new multi-use retail facility. Initial phase to include site improvements, traffic controls and tenant criteria implementation.
Contract: $1,200,000.00±
Project currently in design. RCFD MezzanineClient: Rockwell Collins Flight Dynamics
16600 SW 72nd Avenue Portland, OR 97224-7799 Summary: Integral part of design team providing Construction Management/GC services overseeing expansion of existing aeronautic research, development and manufacturing facility.
Contract: $1,400,000.00±
Project currently in design. Lloyd Center Accessibility ImprovementsClient: LC Portland, LLC
Glimcher Lloyd Venture, LLC 180 East Broad Street Columbus, OH 43215 Summary: TBD
Contract: $261,161.97
Completed: 2009-11-30
Papa Murphy's (Newberg) - Exterior ImprovementsClient: Storey Investment, LLC
30998 SW Orchard Drive Wilsonville, OR 97070-7535 Summary: TBD
Contract: $148,802.84
Completed: 2009-06-13
Apollo College/Devry 1st Impression - Lloyd CenterClient: Apollo College
Divison of US Education Corporation 2004 NE Lloyd Center Portland, OR 97232 Summary: TBD
Contract: $106,560.64
Completed: 2009-03-31
Lake Plaza South - Fascia RepairClient: 6902 Lake Plaza South, LLC
29000 Cliffside Drive Malibu, CA 90265 Summary: TBD
Contract: $40,847.00
Completed: 2009-03-31
Management Office - Lloyd CenterClient: Glimcher Development Corporation
180 East Broad Street Columbus, OH 43215 Summary: TBD
Contract: $29,200.00
Completed: 2009-01-08
Space C120 - Lloyd CenterClient: Glimcher Development Corporation
180 East Broad Street Columbus, OH 43215 Summary: TBD
Contract: $66132.59
Completed: 2008-11-19
Apollo Dental College - Lloyd CenterClient: Glimcher Development Corporation
180 East Broad Street Columbus, OH 43215 Summary: TBD
Contract: $1,373,899.40
Completed: 2008-10-30
Weight Watchers - Lloyd CenterClient: Glimcher Development Corporation
180 East Broad Street Columbus, OH 43215 Summary: TBD
Contract: $106,491.36
Completed: 2008-10-24
Phoenix Inn Hotel - BendClient: PIH Bend, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: General Contractor and integral part of renovation team, work included analysis and replacement of existing facade, structural repairs and waterproofing upgrades.
Contract: $2,622,747.30
Completed: 2008-06-30
Rose's Restaurant & Deli - Lloyd CenterClient: Glimcher Development Corporation
180 East Broad Street Columbus, OH 43215 Summary: General contractor for landlord's portion of vanilla shell improvements for new tenan. Work included new demising walls, restroom build-out, HVAC and elecrical.
Contract: $333.661.64
Completed: 2008-06-30
Phoenix Inn - N. SalemClient: PIH North Salem, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: General Contractor and integral part of renovation team, work included exterior painting and minor repair of existing facade.
Contract: $173,464.75
Completed: 2008-04-01
Phoenix Inn Hotel-EugeneClient: PIH Eugene, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: General Contractor and integral part of renovation team, work included analysis and replacement of existing facade.
Contract: $1,512,640.66
Completed: 2008-02-29
Phoenix Inn Hotel - BeavertonClient: PIH Beaverton, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: General Contractor and integral part of renovation team, work included analysis and replacement of existing facade along with extensive structural repairs.
Contract: $2,018,591.27
Completed: 2008-02-19
Canby PlaceClient: Sterling Development
3352 Holiday Court, Suite 224 La Jolla, CA 92037-1808 Summary: Integral part of design team providing Construction Management/GC services overseeing development and construction of new multi-use retail facility. Initial phase included site improvements, traffic controls and tenant criteria implementation. Second phase included managing tenant buildouts.
Contract: $198,233.00
Completed: 2007-09-28
Phoenix Inn Hotel - Lake OswegoClient: PIH Lake Oswego, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: General Contractor and integral part of renovation team, work included analysis and replacement of existing tile roof and facade.
Contract: $828,965.08
Completed: 2007-08-31
Water Main Break - Lloyd CenterClient: Lloyd Center Mall
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided emergency General Contracting services to repair water leak on Time & Material basis.
Contract: $72,951.60
Completed: 2007-06-12
Phoenix Inn Hotel - TigardClient: PIH Tigard, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: General Contractor and integral part of renovation team, work included analysis and replacement of existing facade on first of three recently acquired Portland-metro area properties.
Contract: $1,497,903.44
Completed: 2007-05-31
Phoenix Inn Hotel - OlympiaClient: PIH Olympia, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: Coordinated exterior repaint of fully operational hotel property. Minor repairs to EIFS facade are included.
Contract: $99,093.00
Completed: 2007-05-15
Dyna (Adware) - Lloyd CenterClient: Dynalectric Company
5805 SW Hood Avenue Portland, OR 97239-3716 Summary: Provided demolition and replacement services to low-voltage contractor working in high-traffic areas of large retail shopping complex.
Contract: $21,800.00
Completed: 2007-05-01
Phoenix Inn Hotel - AlbanyClient: PIH Albany, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: Coordinated exterior repaint and minor EIFS repairs of fully operational hotel property.
Contract: $98,101.00
Completed: 2007-03-30
OHSU Restroom Remodel - Lloyd CenterClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: As General Contractor, updated existing restrooms including fixtures, lighting, tile and other finishes in tenant-occupied, professional space.
Contract: $31,881.05
Completed: 2006-11-15
Phoenix Inn Hotel - South SalemClient: PIH South Salem, LLC
12265 El Camino Real, Suite 300 San Diego, CA 92130-4096 Summary: As General Contractor, coordinated exterior repaint of fully operational hotel property. Fast-tract project completed in less than one week.
Contract: $95,816.00
Completed: 2006-10-27
Men's Warehouse Expansion - LCClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: As General Contractor, completed landlord's portion of expansion project. Work included reconfiguring storefront, new demising walls, fire protection, electrical and finishes.
Contract: $132,926.30
Completed: 2006-10-24
Old Navy Slab Removal & ReplacementClient: Glimcher Development Corp.
150 East Gay Street Columbus, OH 43215-3130 Summary: As General Contractor, removaled and replaceed 15,000 SF of concrete slab in vacated retail space of major retail shopping mall. Time-sensitive project included deconstruction and reconstruction of space, environmental protection measures, and installation of new epoxy floor system per tenant's stringent criteria.
Contract: $373,272.02
Completed: 2006-09-27
Anchor Blue/Old Navy Relocation - Lloyd CenterClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: Fast-track, time-sensitive project having prepared vacant space to accept tenant moved from other mall location. Modified facility to tenant's criteria to maintain corporate brand image.
Contract: $159,635.86
Completed: 2006-09-27
Ames Tools - Greenhouse SquareClient: Ames Taping Tool Systems, Inc.
3305 Breckinridge Blvd., Suite 122 Duluth, GA 30096-4932 Summary: As General Contractor, completed tenant build-out of newly demised retail space. Scope of work included concrete, framing, doors & windows, finishes, mechanical and electrical trades.
Contract: $53,422.29
Completed: 2006-07-01
Verizon Demising Wall - LCClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: Completed landlord-required demising project to accommodate new tenant.
Contract: $26,012.89
Completed: 2006-06-21
Old Navy Floor ReplacementClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: As General Contractor, completed partial removal of overlay floor product in 15,000± SF occupied retail space within a large retail complex. Project consisted of removal and replacement of tenant's furnishings while maintaining zero-to-minimual operational impact, environmental and public safety measures, and installation of tenant's new epoxy floor system.
Contract: $219,994.64
Completed: 2006-05-31
Aeropostale - LCClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: General Contractor completed landlord's portion of expansion project. Work included extensive demolition, floor leveling, and carpentry.
Contract: $53,318.62
Completed: 2006-05-01
Hollister Landlord Prep - LCClient: Glimcher Development Corporation
150 East Gay Street Columbus, OH 43215 Summary: Demolished existing restaurant space in preparation for new tenant. Completed demising and interior configuration modifications.
Contract: $47,723.00
Completed: 2006-03-31
Bajio 82nd AvenueClient: Bajio Oregon, LLC
12626 SW Creekshire Drive Tigard, OR 97223-5470 Summary: General Contractor for placement of unground utilties prior to landlord's floor completion. OCMI also provided preconstruction information on layout and mechanical systems.
Contract: $23,460.71
Completed: 2006-01-31
Vivacity Vanilla ShellClient: JR Investments, Oregon
47 Broadway Los Gatos, CA 95030 Summary: As General Contractor, returned vacated health club back to vanilla shell condition to accept new tenant.
Contract: $20,549.44
Completed: 2006-01-23
Old Navy Floor TestingClient: Glimcher Realty Trust, LLC
150 East Gay Street Columbus, OH 43215-3130 Summary: Time & Material project conducting onsite environmental testing of occupied retail space as directed Client. All work after regular business hours and subject to stringent environmental requirements.
Contract: $14,141.62
Completed: 2005-12-23
Vacant Space Landlord PrepClient: JA Investment Properties, LLC
2506 NW 24th Circle Camas, WA 98607 Summary: Provided GC services to complete landlord preparation of vacant space in retail shopping facility for leasing. Scope included emergency water line excavation and repair.
Contract: $79,480.78
Completed: 2005-10-25
WA Green Facade RenovationClient: Washington Green Shopping Center, TIC
15 SW Colorado Avenue, Suite G Bend, OR 97702-1146 Summary: General Contractor for up-scale three-building retail center exterior renovation project. Scope covered fast-track completion of EIFS demolition with stucco replacement, concrete, structural-framing, and tile.
Contract: $275,620.77
Completed: 2005-08-31
Deveraux GlenClient: J. Peterkort & Company
9755 SW Barnes Road, Suite 690 Portland, OR 97225-6657 Summary: Provided Construction Management services to majority partner of new 20-acre multi-phase high-end apartment development. Services included construction document review for 625,000± sf of structures, onsite means & methods assessment and quality-control evaluation.
Contract: $45,159.12
Completed: 2005-08-31
OHSU Office TI - Lloyd CenterClient: University Medical Group
950 Lloyd Center, PMB 070 Portland, OR 97232-1262 Summary: General Contractor for new office expansion in tenant-occupied space. Scope included demolition, carpentry, drywall, paint, and floorcoverings.
Contract: $60,671.97
Completed: 2005-07-07
Bajio TigardClient: Bajio Oregon, LLC
12626 SW Creekshire Drive Tigard, OR 97223-5470 Summary: General Contractor for first of six specialty eateries new to Pacific Northwest. As vital member of franchise team, OCMI assisted with refining design, environmental upgrades and engineering requirements for fast-track restaurant project. Finishes included unique faux painting, floor finishes and tile accents. Project was completed eight days ahead of schedule allowing restaurant to open on target date.
Contract: $256,203.67
Completed: 2005-06-14
Lake Plaza South - Third Floor TIClient: 6902 SE Lake Road, LLC
29000 Cliffside Drive Malibu, CA 90265-4214 Summary: Provided General Contracting services for two-phase tenant improvement project in three-story, Class-A office complex. Components of project included reconfiguration of existing spaces, adding offices, removing finishes and reinstalling to tenant's specifications all floorcoverings, plumbing, HVAC and electrical upgrades.
Contract: $206,851.78
Completed: 2005-04-20
Apollo X-Ray Addition - Lloyd CenterClient: Apollo College, Inc.
2004 NE Lloyd Center Portland, OR 97232-1309 Summary: As General Contractor, completed addition of new x-ray facility at NE campus. Scope included plumbing, drywall, painting, electrical and casework in occupied space.
Contract: $11,967.70
Completed: 2005-04-15
Papaya Tenant Demo - Lloyd CenterClient: Glenn Michael Northrup
dba GM Northrup 15950 Franklin Trail, SE Prior Lake, MN 55372-2013 Summary: Tenant requested additional demolition for new Papaya clothing store at Lloyd Center Mall.
Contract: $19,455.00
Completed: 2005-03-21
Emergency Truss Repair - Holly Farm MallClient: JA Investment Properties, LLC
2506 NW 24th Circle Camas, WA 98607 Summary: Completed emergency truss repair to vacant retail space in preparation for new tenant. Time & Material scope included carpentry, metal reinforcement of structural framing and water diversion.
Contract: $8,597.73
Completed: 2005-03-17
Papaya Landlord Prep - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Completed landlord's demolition of three separate retail spaces to accommodate new clothing tenant. Scope included FRP-wrapped column repair.
Contract: $38,005.00
Completed: 2005-03-09
LRD Kidney Care RelocationClient: Kaiser Permanente
500 NE Multnomah Street, Suite 100 Portland, OR 97232-2099 Summary: Additional tenant work requested for Lake Plaza South remodeling.
Contract: $8,434.00
Completed: 2005-03-04
Overlook Center - Seismic UpgradeClient: JR Investments, Oregon
47 Broadway Los Gatos, CA 95030-6802 Summary: As an integral part of the project's structural design team, provided GC services to complete seismic upgrade to tenant-occupied, four-story, Class-A office building. Scope of Work included removal and reinstallation of interior walls and finishes for installation of prototype structural steel elements.
Contract: $221,550.00
Completed: 2005-01-01
Albertson's Demolition - Holly Farm MallClient: JA Investment Properties, LLC
2506 NW 24th Place Camas, WA 98607 Summary: Provided General Contracting services to demolish former retail grocery store in preparation for landlord's new tenant. Project included removal of all existing partions, coolers/freezers, ceiling systems, mechanical components, millwork and display cabinets.
Contract: $76,145.00
Completed: 2004-12-30
Steamers Dumplings & Tea - Lloyd CenterClient: Steamers Corporation
12042 SE Sunnyside Road, #578 Clackamas, OR 97015-8382 Summary: Provided General Contracting services for new food-court restaurant including integrating HVAC, plumbing and electrical systems with Client's new equipment package. Fast-track project requiring work in adjacent tenant’s spaces after-hours.
Contract: $96,100.00
Completed: 2004-12-30
Holly Farm Mall - ParapetsClient: JA Investment Properties, LLC
2506 NW 24th Circle Camas, WA 98607 Summary: Provided General Contracting services to complete reconstruction of retail center's facade including EIFS and sheet metal.
Contract: $24,712.86
Completed: 2004-11-30
Apollo Lab Cabinets - Lloyd CenterClient: Apollo College, Inc.
2004 NE Lloyd Center Portland, OR 97232-1309 Summary: As General Contractor, completed addition of new lab facilities in NE campus. Scope included plumbing, drywall, painting, electrical and casework in occupied space.
Contract: $37,583.13
Completed: 2004-11-30
Old Navy - Landlord Preparations - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Fast-track eight-week project to complete demolition and reconfiguration of four existing retail spaces in preparation for large anchor tenant. Scope of work includes perimeter mall facade reconstruction, relocation of all mechanical and electrical equipment and vanilla-shell finishes.
Contract: $473,939.05
Completed: 2004-11-15
Brookstone Demising - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Provided Design, Engineering and Construction Management services to divide space and bring to vanilla shell condition.
Contract: $16,950.00
Completed: 2004-09-09
Restaurant Ceiling Repair - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Provided Design/Build services to remove and replace abandoned restaurant ceiling to meet current codes as required by Portland Fire Marshall.
Contract: $4,850.00
Completed: 2004-08-31
Pacific Place Center - Bldgs A&BClient: JR Investments, Oregon
47 Broadway Los Gatos, CA 95030-6802 Summary: General Contractor for 30,000± SF up-scale retail center EIFS repair project. Scope covers demolition, concrete, EIFS, mold/mildew remediation, structural-framing and roof repairs; in addition to assistance with insurance and litigation settlements.
Contract: $635,117.66
Completed: 2004-07-31
GNC - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Provided Design, Engineering and Construction Management services to divide space and bring to vanilla shell condition.
Contract: $11,650.00
Completed: 2004-07-31
Compactor #6 Pad Repair - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Provided General Contracting services to remove and replace structural concrete slab.
Contract: $23,897.00
Completed: 2004-07-31
Nordstrom Courtyard - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: Provided emergency General Contracting services to repair water leak on Time & Material basis.
Contract: $10,980.00
Completed: 2004-07-16
Ross Dress For Less Landlord Improvements - Lloyd CenterClient: Glimcher Development Corp.
150 East Gay Avenue Columbus, OH 43215-3130 Summary: General Contractor on 36,000± SF landlord improvement project for new anchor tenant at Lloyd Center Mall. Trades include demolition, carpentry, EIFS, elevator/escalator work, concrete, storefront, roofing, mechanical and electrical.
Contract: $989,046.86
Completed: 2004-06-19
Water Main Repair - Lloyd CenterClient: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided emergency General Contractor services to repair major water supply break to Lloyd Center Mall.
Contract: $42,994.13
Completed: 2004-03-01
Ice Chalet Elevator - Lloyd CenterClient: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided Construction Management services and carpentry to reroute primary hydraulic lines through new service corridor.
Contract: $4,920.00
Completed: 2004-02-01
Hillsboro Promenade - EIFS RepairClient: Hillsboro Promenade, LLC
3352 Holiday Court, Suite 224 La Jolla, CA 92037-1808 Summary: Provided Construction Management and General Contractor services overseeing exterior facade evaluation and repair to large retail shopping center.
Contract: $487,448.61
Completed: 2003-12-01
Credence Systems Corp - Emergency ShoringClient: Emcor Facilities
5975 NW Pinefarm Place Hillsboro, OR 97124-8563 Summary: Provided emergency services to stable exterior storefront during eminent collapse situation.
Contract: $4,232.48
Completed: 2003-12-01
Pacific Place Center - Bldg C EIFS RepairClient: Oscar D. Palacios dba ODB Systems
C/O Columbia Commercial Properties 7460 SW Hunziker Road, Suite "D" Tigard, OR 97223-8244 Summary: Provided Construction Management services and carpentry to repair failing EIFS application, mold/mildew remediation and structural upgrades on an up-scale retail center. Scope includes assistance with insurance claim and litigation preparation.
Contract: $511,177.65
Completed: 2003-08-01
Papa Murphy's Take 'N' Bake Pizza - Camas RelocationClient: James Lovelace
5512 NE 109th Court, Suite "F" Vancouver, WA 98662-6175 Summary: Provided General Contractor services to complete new tenant improvement from vanilla shell including under-ground untilities and finishes.
Contract: $77,617.77
Completed: 2003-05-01
La Belle Vie - Lloyd CenterClient: La Belle Vie I, Inc.
12000 SE 82nd Avenue, #1004-L103 Portland, OR 97266-7729 Summary: Provided design/build services for 1,200 SF day spa including architectural, plumbing, mechanical and electrical plans as well as high-end finishes.
Contract: $192,687.76
Completed: 2002-11-01
Lloyd Center - OHSUClient: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided General Contractor services for new office expansion in tenant occupied space.
Contract: $47,068.00
Completed: 2002-10-01
LLOYD CENTER - TRANSFORMERClient: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided emergency construction services to remove and replace five-ton electrical unit at Oregon's largest indoor mall.
Contract: $43,325.94
Completed: 2002-08-01
Apollo College - Lloyd CenterClient: Glimcher Development Corp.
20 S. Third Street Columbus, OH 43215-4244 Summary: Provided General Contractor services for fast-track buildout of 12,246 SF technical training facility including value engineering, classroom improvements and medical equipment installation.
Contract: $430,795.36
Completed: 2002-08-01
Imperial Beach PromenadeClient: Promised Land Development, LLC
3352 Holiday Court, Suite 224 La Jolla, CA 92037-1808 Summary: Provided Construction Management services overseeing the completion of public/private retail redevelopment project.
Contract: $39,950.00
Completed: 2002-06-01
Papa Murphy’s Take ‘N’ Bake Pizza – Andresen Fire RestorationClient: Papa Murphy’s International
8000 NE Parkway Drive, Suite 350 Vancouver, WA 98662 Summary: Provided emergency salvage services to prepare a fire & water damaged outlet for reconstruction. Served as liaison with the primary insurance carrier claims adjuster as well as center’s general contractor to complete a fast-track full restoration of the space to mitigate downtime and expedite reopening.
Contract: $195,968.88
Completed: 2002-06-01
Papa Murphy’s – Pacific Highway RelocationClient: Papa Murphy’s International
8000 NE Parkway Drive, Suite 350 Vancouver, WA 98662 Summary: Provided General Contractor services to complete the conversion of an existing free-standing building to meet the client’s specific criteria, including site renovations, finishes, mechanical and electrical systems.
Contract: $80,542.00
Completed: 2002-05-01
Toni & Guy Hair Salon – Lloyd CenterClient: Comtex Construction Services
3402 Wiley Post Road Carrollton, TX 75006-5116 Summary: Provided General Contractor services for new, upscale hair salon including value engineering, high-end finishes, new mechanical and electrical systems.
Contract: $225,238.00
Completed: 2002-04-01
Lloyd Center – Space B112Client: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided Design, Engineering and Construction Management services to divide space and bring to vanilla shell condition.
Contract: $26,580.00
Completed: 2002-04-01
900 “F” Street ApartmentsClient: 900 “F” Street Partners, LP
3352 Holiday Court, Suite 224 La Jolla, CA 92037-1808 Summary: Provided Construction Management services reviewing construction methodology used in HUD housing development project.
Contract: $29,419.00
Completed: 2001-12-01
Hot Topic – Lloyd CenterClient: Hot Topic, Inc.
18305 E. San Jose Avenue City of Industry, CA 91748-1237 Summary: Provided construction services to complete the fast-track tenant improvement of new retail space for national chain.
Contract: $125,605.00
Completed: 2001-11-01
Lloyd Center – Space F112Client: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided construction services for new corridor and to complete vanilla shell requirements.
Contract: $51,050.00
Completed: 2001-10-01
Old Navy - Beaverton MallClient: Fisher Development, Inc.
1485 Bayshore Boulevard, #152 San Francisco, CA 94124 Summary: Performed all metal framing, drywall, storefront, EFIS and painting trades required for tenant improvement on new 22,372 square foot retail facility.
Contract: $289,843.07
Completed: 2001-08-01
Merle Norman Cosmetics – Lloyd CenterClient: Ms. Dorothy Anderson
1307 NE Lloyd Center Portland, OR 97232 Summary: Provided Design, Engineering and Construction Management services for the relocation for one of Lloyd Center’s original tenants.
Contract: $130,133.00
Completed: 2001-07-01
Beard Frame Shop – Lloyd CenterClient: Beard Frame Shop
PO Box 84003 Seattle, WA 98124 Summary: Provided Construction and Management services to complete the fast-track tenant improvement of this client’s new retail space including wall finishes, ADA restroom upgrade, and electrical.
Contract: $55,333.50
Completed: 2001-06-01
North Pacific RenovationsClient: North Pacific Group, Inc.
815 NE Davis Portland, OR 97208-3915 Summary: Provided Design, Engineering and Construction Management services to oversee the renovation of an owner-occupied, four-story high-rise building including structural, space, mechanical, elevator and control systems.
Contract: $78,075.00
Completed: 2001-06-01
Lloyd Center – Space B215Client: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided Design, Engineering and Construction Management services to revert tenant-improved space to vanilla shell condition.
Contract: $38,115.17
Completed: 2001-05-01
Gap 2000/Gap Body – Lloyd CenterClient: Fisher Development, Inc.
1485 Bayshore Boulevard, #152 San Francisco, CA 94124 Summary: Performed all trades except Fire Protection, Mechanical and Electrical required on a major 14,000 square foot retail conversion.
Contract: $422,391.93
Completed: 2000-11-01
Old Navy -- Lancaster MallClient: Fisher Development, Inc.
1485 Bayshore Boulevard, #152 San Francisco, CA 94124 Summary: Performed all carpentry, metal, graphic design and electrical trades required for tenant improvement on new 28,000 square foot retail facility.
Contract: $117,799.00
Completed: 2000-11-01
Gap & Gap Kids – Gresham StationClient: Fisher Development, Inc.
1485 Bayshore Boulevard, #152 San Francisco, CA 94124 Summary: Supplied and installed nearly 10,000 square feet of premium wood flooring, as well as all resilient floor coverings in new retail outlet location. Provided extra finish work as directed by client.
Contract: $113,727.95
Completed: 2000-11-01
Lloyd Center – Space H220Client: Glimcher/Lloyd Venture, LLC
2201 NE Lloyd Center Portland, OR 97232 Summary: Provided Engineering and Construction Management services for landlord portion of tenant improvement project.
Contract: $29,528.70
Completed: 2000-09-01
Dynalectric - Reception/Mail RoomClient: Dynalectric Company
5805 SW Hood Avenue Portland, OR 97239-3716 Summary: TBD
Contract: 68,357.36
Completed: 2000-06-30
1022 Salmon BuildingClient: Columbia Commercial Properties, LLC
7460 SW Hunziker Road, Suite D Tigard, OR 97223 Summary: Provided Design, Engineering and Construction Management services for the remodeling and conversion of downtown Portland commercial spaces.
Contract: $60,700.00
Completed: 2000-05-01
Lloyd Center Management Services CenterClient: Northwest Protection Services
2203 NE Lloyd Center Portland, OR 97232 Summary: Provided Design, Engineering and Construction Management services overseeing conversion of new security offices.
Contract: $25,000.00
Completed: 2000-05-01
Yen Ha RestaurantClient: Dolores Howell & Alice Pieretti
3135 SE 131st Place Portland, OR 97230 Summary: Refurbished tenant-occupied restaurant facility. Coordinated upgrade of electrical, HVAC and environmental systems to meet City of Portland requirements.
Contract: $115,268.00
Completed: 2000-04-01
Kokopelli KafeClient: Taste Bite, Inc.
4309 SE Woodstock Portland, OR 97206 Summary: Provided Design, Engineering and Construction Management services to remodel restaurant facility.
Contract: $29,227.00
Completed: 2000-02-01
Papa Murphy’s Take ‘N’ Bake Pizza FranchisesClient: Papa Murphy’s International, Inc.
8000 NE Parkway Drive, Suite 350 Vancouver, WA 98662 Summary: Provided Construction Management services overseeing the construction, renovation and standardizing of various West Coast franchises.
Contract: $500,000.00±
Completed: 2000-01-01
Lloyd Center PharmacyClient: Don West
1302 Lloyd Center Portland, OR 97232 Summary: Provided Design, Engineering and Construction Management services overseeing the build out and completion of new pharmacy space.
Contract: $521,000.00
Completed: 1999-10-01
Morrell ResidenceClient: Tom & Mary Morrell
1539 NW La Camas Camas, WA 98607 Summary: Researched and identified EIFS (Exterior Insulated Finish System)water penetration damage. Repaired structural damage. Replaced affected stucco, flashing, roofing and windows to secure new 10-year warranty for homeowner.
Contract: $105,000.00
Completed: 1999-07-01
Retail Outlet Mall UpgradeClient: McMinnville Retail Center
McGregor Family Trust 5550 SW Macadam Avenue Portland, OR 97201 Summary: Managed the upgrade of the facility with new mansards, canopies, site-development and utilities.
Contract: $220,000.00
Completed: 1998-09-01
Ward Estate Retail CenterClient: Ward Estate Co, Ore., Ltd.
1740 NE 118th Avenue Portland, OR 97220 Summary: Managed the construction of a new 10,000 square foot, Class-A office complex. Project included site development, utilities, off site development, security systems and tenant improvements.
Contract: $1,200,000.00
Completed: 1998-08-01
Clifford ApartmentsClient: Martin Shore; Fowler, Shore Acquisitions Ltd.
1 Harbor Drive, Suite 200 Sausalito, CA 94965 Summary: Took over control of property immediately after major fire. Assisted
Residents in finding temporary housing; interfaced with American Red Cross. Negotiated claim with insurance provider for final replacement construction. Managed reconstruction project from design, through permit process, to final occupancy. Contract: $2,900,000.00
Completed: 1998-04-01
Hillsboro PromenadeClient: Sterling Development
3352 Holiday Court, Suite 224 La Jolla, CA 92037 Summary: Provided Construction Management/General Contractor (CMGC) services overseeing development and construction of ten-acre retail outlet mall.
Contract: $13,500,000.00
Completed: 1998-02-01
Farmer’s Insurance BuildingClient: Farmer’s Insurance Group
4680 Wilshire Boulevard Los Angeles, CA 90010 Summary: Provided Project Management services overseeing reconstruction of 10,000 square foot office building. Fast-track completion, four weeks.
Contract: $300,000.00
Completed: 1998-02-01
Pacific Place CenterClient: JR Investments, Oregon
47 Broadway Los Gatos, CA 95030 Summary: Managed the construction of a new two-story, 11,000 square foot office and retail building, along with the remodeling of two existing retail buildings, including seismic and fire-life-safety code requirements, ADA upgrades, new mansards, and arcades.
Contract: $1,200,000.00
Completed: 1998-02-01
Medical Office RenovationClient: Lloyd Center Family Practice
2201 Lloyd Center Plaza Portland, OR 97232 Summary: Remodeled 6,000 square foot medical office.
Contract: $139,000.00
Completed: 1997-12-01
Retail Store DevelopmentClient: Powell’s Bookstores
1005 W. Burnside Portland, OR 97220 Summary: Upgraded facility to comply with current ADA requirements.
Contract: $117,500.00
Completed: 1997-11-01
Facility DevelopmentClient: Bonneville Power Administration
905 NE 11th Avenue Portland, OR 97208 Summary: Provided Project Management for redevelopment of existing 10,000 square foot, Class-A office facility. A six-week, fast-track construction schedule. As a negotiated design & build project, it received the highest BPA Contractor’s Performance Evaluation rating.
Contract: $710,000.00
Completed: 1997-10-01
US Postal Service Remote Encoding CenterClient: Heitman Properties
2201 Lloyd Center Plaza Portland, OR 97232 Summary: Provided Project Management for construction of 15,000 square foot, Class-A industrial center. Development was a fast-track project with mandatory five-week construction window. Project included design & build, mechanical, electrical and security systems, along with full space development.
Contract: $820,000.00
Completed: 1997-08-01
Civic Apartments RenovationClient: Fowler, Shore, & Flannigan
1 Harbor Drive, Suite 200 Sausalito, CA 94965 Summary: Provided Project Management covering extensive fire renovations to a four-story, multi-unit apartment complex. Project included design & build, mechanical and electrical systems, renovation of all interior components, complete structural and seismic upgrades, as well as implementation of current building code requirements.
Contract: $602,560.76
Completed: 1997-07-01
Concrete Tilt BuildingClient: Pull-It Corporation
Tigard, OR 97223 Summary: Provided Project Management for construction of new 7,000 square foot concrete tilt-fabrication facility. Project included related site development.
Contract: $376,000.00
Completed: 1997-07-01
Automotive FacilityClient: Valvoline Instant Oil Change / BD Lube, Inc.
1354 Skye Parkway West Linn, OR 97068 Summary: Provided Project Management for construction of two new oil- change facilities. Project included site development, off-site development, utilities and adjacent roads.
Contract: $800,000.00
Completed: 1997-05-01
MISCELLANEOUS PROJECT DESCRIPTIONS
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
This site constructed and maintained by Erik Szewczyk, to e-mail him click here. |